編號 : 2014005
項目名 : Project Management of a Project above a Running Railway at 御龍山 (The Palazzo) in Fo Tan
學會持續專業發展編號 : Formal Events
講師 : Sr Daniel C. Lam, BBS, JP

Sr Lam is the Honorary Advisor of DCL Consultants Limited and was the Director – Property of the Kowloon-Canton Railway Corporation from 2000 to 2007. He is a Chartered Building Surveyor and an Authorized Person under the Buildings Ordinance of Hong Kong. He is a Fellow of the Royal Institution of Chartered Surveyors and the Hong Kong Institute of Surveyors. Sr Lam was the President of the Hong Kong Institute of Surveyors (1986-1987).

Sr Lam has been elected as a Chartered Arbitrator and listed on the London Panel of Arbitrators of the Chartered Institute of Arbitrators. He is also listed on similar panels in Hong Kong and Vancouver, and is appointed as Arbitrator to the China International Economic Trade Arbitration Commission. He is a council member of the Hong Kong International Arbitration Centre and Fellow and Past Chairman of the Hong Kong Institute of Arbitrators (1997-2000).

Since 2006, Sr Lam has been appointed as Honorary Professor to the Real Estate and Construction Department of the University of Hong Kong. For his meritorious contribution to the professions and the public services, Sr Lam was appointed as a non-official Justice of Peace in 1996 and awarded the Bronze Bauhinia Star in 2001.
日期 : 2014-01-16
時間 : 7:00 pm – 8:30 pm
註冊截止日期 : 2014-01-02
有關組別之資格預審前研習小時 : 1.5
地點 : 香港上環干諾道中111號永安中心12樓 1207室測量師研究中心
部門 : BSD
費用 : HK$120 for HKIS members; HK$200 for non-members (HK$30 walk-in surcharge on all prices listed)
名額 : HKIS BSD Members; First-come-first-served.
語言 : Cantonese supplemented by English
詳情 :

The planning and construction of a development immediately above a running railway are very complicated and hazardous, and is normally a precarious venture that most professionals would wish to avoid.

 

At 御龍山 (The Palazzo) in Fo Tan, such an attempt was made successfully to turn an open railway depot along with a 24-hour running railway line into a multi-storey residential complex.  The project took more than 8 years to plan and build, and the difficulties encountered during the process are numerous, involving complicated safety issues as well as political arguments.

As one of the prime initiator and the implementer of this project, Sr Lam is going to share with all members attending this CPD event his experience during those years.

付款 : HKD 120
Face-to-Face/Zoom : Please refer to the remarks