編號 : 2015039
項目名 : Visit to Stanley Sewage Treatment Works
學會持續專業發展編號 : Formal Events
講師 : Representative from Drainage Services Department
日期 : 2015-03-24
時間 : 10:00am – 11:30am
有關組別之資格預審前研習小時 : 1.5
地點 : Stanley Sewage Treatment Works, No.37, Wong Ma Kok Road, Stanley, Hong Kong
部門 : BSD QSD
費用 : HK$120 for members (including insurance)
名額 : Priority will be given to Corporate BSD / QSD members (till 24 February 2015) and followed by all BSD / QSD members (till 3 March 2015); First-come-first-served with payment (with maximum quota of 17)
語言 : Cantonese
詳情 :

Itinerary :

9:45 am - Gathering at the Main Entrance of Stanley Sewage Treatment Works

10:00 am - Visit to Stanley Sewage Treatment Works

11:30 am - Dismiss at Stanley Sewage Treatment Works

 (Successful registration will receive details of the visit.)

 

Stanley Sewage Treatment Works (“Stanley STW”) is a secondary sewage treatment works, built in caverns. It serves a population of over 27,000 in Stanley, Ma Hang, Tai Tam, Chung Hom Kok and Red Hill areas, which currently produces 8,800 m3 of sewage per day. Sewage is collected by outlying sewage pumping stations and transferred to Stanley STW for further treatment.

As a key element of the Stanley Sewerage and Sewage Disposal Scheme drawn up in 1989, Stanley STW was designed and constructed with the latest technology. To maintain the natural environment of the area, Stanley STW was built inside three large caverns, each about 120 metres long, 15 metres wide and 17 metres high together with over 450 metres of road access, ventilation tunnels and shafts. Not only visually unobtrusive, the underground works also spared the neighbourhood with unacceptable environmental impact both during construction and its daily operation. Stanley STW is the first of its kind in Southeast Asia. Stanley STW with a design flow of 11,600m3 per day was constructed from November 1990 to February 1995.

備註 :

FULL

 

Closing Date: 10 March 2015

1. Online registration is NOT accepted for this CPD event.

2. Please fill in the attached Declaration Form together with Standard Reservation Form for this CPD event.

3. First-come-first-served with duly completed Standard Reservation FormDeclaration Form and payment.

4. Please equip with your own non-slip shoes.

5. Latecomers will NOT be picked up.

6. Transportation to Stanley Sewage Treatment Works by bus to be arranged by members (Please also see the attached location map):

a. Route 14 from Sai Wan Ho Ferry Pier (Grand Promenade) to Stanley Fort (Gate); or

b. Route 6A from Central (Exchange Square) to Stanley Fort

 

付款 : HKD 120
Face-to-Face/Zoom : Please refer to the remarks