編號 : 2015057
項目名 : Visit to Factory of Precast Concrete Elements, Steel Moulds, StarfonTM, GRC and GRG, and BIM Centre in Huizhou
學會持續專業發展編號 : Formal Events
講師 : Mr. Gary Wong
General Manager, Yau Lee Wah Concrete Precast Products Company Limited
日期 : 2015-06-27
時間 : 9:00am – 6:30pm
有關組別之資格預審前研習小時 : 3
地點 : (有利華建材(惠州)有限公司 – 中國廣州省惠州市惠陽區新圩鎮紅田村)
部門 : QSD
費用 : HK$300 for members (including transportation, lunch and insurance)
名額 : Priority will be given to Corporate QSD members (till 10 April 2015) and followed by all QSD members (till 24 April 2015); First-come-first-served with payment (with maximum quota of 38)
語言 : Cantonese
詳情 :

Itinerary :

8:45am - Gathering at Kowloon Tong MTR Station (at Junction of Kent Road and Somerset Road)

9:00am - Depart from Kowloon Tong

11:30am - Presentation at Factory in Huizhou

12:30pm – Lunch

2:00pm - Visit Factory of Precast Concrete Elements, Steel Moulds, StarfonTM, GRC and GRG, and BIM Centre

4:00pm - Depart from Factory in Huizhou

5:30 pm - Dismiss at Fu Tian Check Point, Shenzhen(深圳福田口岸)

or

6:30pm - Dismiss at Kowloon Tong MTR Station

 

(The scheduled time may be changed so as to suit the actual conditions on the date of the visit.)

 

(Successful registration will receive details of the visit.)

 

Yau Lee Wah Concrete Precast Products Company Limited (“Yau Lee Wah”) established in 1997, focuses mainly on six kinds of business, including concrete precast units, drywall, cooking bench and sink unit, metal fabrication and steel mould, GRC and GRG products and aluminium window. Yau Lee Wah has committed to excellent management and innovative spirit, expanding its business in the light of “Local Foundation, International Vision”. Its products have been widely adopted by Hong Kong Housing Authority, Architectural Services Department and private developers. Its steel moulds have been promoted to the Japanese market, symbolizing a successful step forwards to the international market. Located at Long Hua in Shenzhen and Huiyang District in Huizhou, Yau Lee Wah has established large-scale production lines and equipped with advanced manufacturing systems and facilities. In Huizhou, the factory has 22 production lines set up on a 155,000 square meter site and the precast factory is equipped with a computerized concrete batching plant, 54 gantries and three steam curing system. Yau Lee Wah was awarded the ISO 9001:2008 certification and ISO 14001:2004.

 

 

This event is to arrange members to visit Yau Lee Wah’s factory and BIM centre in Huizhou. After the visit, members will be familiar with the production of precast concrete elements, steel moulds, StarfonTM, GRC and GRG.

 

備註 :
FULL
 
Closing Date: 13 June 2015
  1. Online registration is NOT accepted for this CPD event.
  2. Please fill in the attached Declaration Form together withStandard Reservation Form for this CPD event.
  3. First-come-first-served with duly completed Standard Reservation FormDeclaration Form and payment.
  4. Please bring valid travel documents.
  5. Please equip with your own non-slip shoes.
  6. Latecomers will NOT be picked up. 
付款 : HKD 300
Face-to-Face/Zoom : Please refer to the remarks