編號 : 2016067
項目名 : QSD Technical Series 2016 (11): Visit to Shatin Sewage Treatment Works
學會持續專業發展編號 : Formal Events
講師 : Representative from Drainage Services Department
日期 : 2016-04-15
時間 : 10:00am – 11:30am
有關組別之資格預審前研習小時 : 1.5
Divisional PQSL Hour(s) : 1.5
地點 : Shatin Sewage Treatment Works, 1 Shui Chong Street, Ma Liu Shui, Shatin, N. T.
部門 : QSD
費用 : HK$120 per member (including insurance)
名額 : Priority will be given to QSD members (till 18 March 2016); First-come-first served with payment (with maximum quota of 25)
語言 : Cantonese
詳情 :

Itinerary :

9:45 am - Gathering at the Main Entrance of Shatin Sewage Treatment Works

10:00 am - Visit to Shatin Sewage Treatment Works

11:30 am - Dismiss at Shatin Sewage Treatment Works

 

(The scheduled time may be changed so as to suit the actual conditions on the date of the visit.)

 

(Successful registration will receive details of the visit.)

 

Shatin Sewage Treatment Works (Shatin STW) is the largest secondary sewage treatment works in Hong Kong.  It occupies 28 hectares of land and serves a population of 600,000 in Shatin and Ma On Shan Districts, which produces 250,000 m3 of sewage per day.

 

Shatin STW was commissioned in 1982.  The treatment capacity was 100,000 m3 per day and was later increased to 200,000 m3 per day in 1986.  To reduce the discharge of nutrient into the Tolo Harbour, nutrient removal facilities were installed in the aeration tanks in 1991, which as a result reduced the treatment capacity to 150,000 m3 per day.  To meet the continuous population growth in Shatin and Ma On Shan, the STW commenced the Stage III Extension in 2001 and part of the works were commissioned in 2005.  The treatment capacity of the STW was increased to 340,000 m3 per day after completion of the remaining works. In order to further improve the effluent quality, an ultraviolet light disinfection system was added in the STW in 2010.

 

In this event, the representatives of the DSD with brief our members the basic concept and operation of the STW.  A tour of different areas of the STW will also be arranged.

備註 :

FULL

 

Closing date: 11 April 2016

 

  1. Online registration is NOT accepted for this CPD event.
  2. Please fill in the attached Declaration Form together with Standard Reservation Form for this CPD event.
  3. First-come-first-served with duly completed Standard Reservation FormDeclaration Form and payment.
  4. Please equip with your own flat bottom non-slip shoes.
  5. Latecomers will NOT be picked up.
  6. Transportation to Shatin Sewage Treatment Works to be arranged by members. (Please also see the attached location map)
  7. By Bus Route 46X (from Mei Foo): drop off at Hin Keng Bus Terminus; then take 10-15 minutes walk.
  8. By MTR: drop off at University Station; then take 10-15 minutes walk.
付款 : HKD
Face-to-Face/Zoom : Please refer to the remarks