編號 : 2017196
項目名 : Experience of BIM Applications in a Power Utility Company
學會持續專業發展編號 : Formal Events
講師 : IP, Anthony Wai Leung,
Senior Project Engineer - Civil Construction

Mr. Ip is a civil and structural engineer by profession. Since joining CLP from 2000, he has been involved in Engineering Projects Department of CLP looking after the transmission projects that include new transmission substations, overhead line tower slopes, tower structural reinforcement and various substations upgrading works for existing circuit network. Mr. Ip is also an expert in BIM application for different civil and transmission projects. Mr. Ip currently is the Senior Project Engineer – Civil Construction.
日期 : 2017-10-24
時間 : 7:00 - 8:30 pm
註冊截止日期 : 2017-10-17
有關組別之資格預審前研習小時 : 1.5
Divisional PQSL Hour(s) : 1.5
地點 : 香港上環干諾道中111號永安中心12樓 1207室測量師研習中心
部門 : LSD
費用 : HK$120 for members; HK$150 for non-members (HK$30 walk-in surcharge on all prices listed)
名額 : LSD members; First-come-first-served
語言 : Cantonese supplemented by English
詳情 :

The talk will give general coverage on BIM application in Power Utility company with more emphasis and details on the contents of the revamped Existing Building tool in comparison with the preceding version of the Tool.

Building Information Modelling (BIM) is a process for managing information on an engineering construction project across the project lifecycle. Traditional engineering design was mostly represented by two-dimensional technical drawings and documents. BIM extends this beyond the three spatial dimensions (width, height and depth) to other dimensions such as ‘time’, ‘cost’, etc. It also covers spatial relationships, light analysis, geographic information and properties of the facility components. With this process, the digital representation of the physical and functional characteristics the facility, BIM Models can be developed to enhance decision making.



CLP Power (CLPP), being the largest electricity supply company in Hong Kong, had employed BIM successfully to enhance the project performance in safety, work planning and coordination, streamline work process, supporting sustainability, environmental and operational aspects. BIM improves the collaboration among designers, contractors and suppliers in delivering the project. This process also can be deployed for the facility management. The talk will share the experience of BIM applications during the different project lifecycle stages in CLPP.