編號 : 2018124
項目名 : Sharing of 'Successful Application of the New Engineering Contract (NEC) in Governmental Projects'
學會持續專業發展編號 : Formal Events
講師 : 1. LAI Yuk On, Simon (Senior Engineer of Drainage Services Department)

Simon LAI graduated in 1990. He has extensive experience in drainage works including operation and maintenance, information technology management, and the recent project management and development.

He is an Accredited NEC3 Engineering and Construction Contract Project Manager. Currently, he manages the works contracts for the Happy Valley Underground Stormwater Storage Scheme (Option C) and the Construction of Dry Weather Flow Interceptor at Cherry Street Box Culvert (Option C).

2. LEUNG Cheuk Lun (Engineer of Drainage Services Department)

C L LEUNG graduated in 1981. He is specialised in construction of engineering infrastructures and major flood control projects in Hong Kong.

He participates in the application of several NEC (Engineering and Construction Contract) Target Cost contracts in DSD, which promotes collaboration, cost saving, risk management and active subcontract management. Currently, he manages the works contracts for the Happy Valley Underground Stormwater Storage Scheme (Option C) and the Construction of an Additional Sewage Rising Main between Tung Chung and Siu Ho Wan and Associated Works (Option D). He also provides NEC advice to 4 NEC Target Cost contracts in DSD.
日期 : 2018-07-31
時間 : 7:00 pm – 8:30 pm
註冊截止日期 : 2018-07-14
有關組別之資格預審前研習小時 : 1.5
Divisional PQSL Hour(s) : 1.5
地點 : 香港上環干諾道中111號永安中心12樓 1207室測量師研習中心
部門 : PFMD
費用 : HK$120 for member, HK$150 for non-member (HK$30 walk-in surcharge for all pricings listed)
名額 : First –come-first-served
語言 : Cantonese (Supplement with English)
詳情 :

The New Engineering Contract (NEC) form has been adopted in the HKSAR Government since 2009, with the 1st NEC pilot being carried out for Fuk Man Road Nullah Improvement in Sai Kung by the Drainage Services Department (DSD).  Since then, the adoption of NEC form has been extended to various works categories in public works.  Under the NEC, the project management office, the contractor and other stakeholders foster a relationship through partnering, mutual trust and co-operation.  On this basis, the parties collaborate closely to foresee and resolve potential problems, thereby promoting early completion and minimizing disputes, and effectively enhancing project cost control.

 

As one of the works departments actively adopting NEC form, DSD has numerous successful cases in applying the NEC features for effective project management.  In this seminar, the speakers will share with the audiences on the successful application of NEC in two signature drainage projects, naming the “Happy Valley Underground Stormwater Storage System”, and “Construction of an Additional sewage rising main between Tung Chung and Siu Ho Wan and Associated Works”.