Code : 2018078
Event Name : QSD Macau Series 2018 (1): Stainless Steel Potable Water System: A New Concept
CPD Code : Formal Events
Speaker : Mr. Chan Churk Kai, Benjamin & Mr. Pang Lok Tin, David

Mr. Chan Churk Kai, Benjamin is a Managing Director of Topbuild Investments Ltd. He has 38 years’ experience in building services industry. He is a member of the Chartered Institute of Plumbing and Heating Engineering.

Mr. Pang Lok Tin, David is a Director of Topbuild Investments Ltd. He is a Metallurgy Engineer. He has over 20 years’ experience in building services industry
Event Date : 2018-04-25
Event Time : 7:00 pm - 8:30 pm (Registration and networking time: from 6:30 pm)
Registration Closing Date : 2018-04-18
CPD Hour(s) : 1.5
Divisional PQSL Hour(s) : 1.5
Venue : Macau Association of Building Contractors and Developers (MABCD) (Rua Do Campo No. 103 5Andar, Macau) 澳門建築置業商會 (澳門水坑尾街103號建築置業商會大廈五樓)
Division : QSD
Organizer : HKIS (QSD), ICES & MABCD
Fee : HK$80 for members of HKIS, ICES & MABCD ; HK$150 for non-members (HK$30 walk-in surcharge on all prices listed)
Priority : Members of HKIS (QSD), ICES & MABCD ; First-come-first-served
Language : Cantonese
Details :

(Details):

 

The Speaker will discuss the following in his talk:

 

In this talk, the speakers will share their experiences in adopting stainless steel potable water system with highlights on the following areas:

 

1. Recap and review Waterworks Regulations

  • Requirements of plumbing installation
  • Requirements for carrying out non-destructive tests and water sampling tests of heavy metals

2. Standard of stainless steel welded tubes and pipes

  • Compare the difference between the standard of BSEN 10312, BSEN 10217-7 and BS 6362 stainless steel pipe application

3. Stainless steel fittings as specified in AS3688: 2016

  • Review the type test requirements between AS3688, BS EN 1254 and BS 8537

4.  Comparison of operation procedures

  • Importance of the sealing material properties
  • Importance of cold form cutting for stainless steel pipe
  • Fittings design characteristics

5. Intrinsic design crisis of press end fittings

  • Investigate the key issues of system installation design to suit for stainless steel potable water system which lead to be safe, reliable and more than 50 years life cycle

6. Indicative costs between stainless steel system and copper system

  • Analyze the cost difference between stainless steel system and copper system in terms of material cost and installation cost

7. Demonstration of cold form cutting and connection of stainless steel pipes

  • Cold form cutting as per DWI of UK application 56.4.477
  • Installation requirements of AS3688: 2016
  • A demonstration of cutting and connection of stainless steel pipes by equipment [P.S. Members may try the procedures under directions
Remarks :

CPD in Macau

Payment : HKD 80
Face-to-Face/Zoom : Please refer to the remarks