Code : 2019121
Event Name : Construction Highlights of the HK-Zhuhai-Macau Bridge (HK section) Project
CPD Code : Formal Events
Speaker : Ir Raymond Wong Wai-man

Ir Raymond Wong is an independent researcher and a lecturer in the Division of Building Science and Technology at City University of Hong Kong. He joined the construction profession in 1977 and obtained his first professional qualification as a Chartered Builder in 1982. Ir Wong is currently a member of the Hong Kong Institution of Engineers and a retired member of the Chartered Institute of Building.

Ir Wong has conducted a series of studies in tall building construction, industrialized construction systems, urban studies, infrastructure projects and other related studies since 1995. He has published more than 150 papers/articles of various nature and topics based on his studies in such areas.
Event Date : 2019-06-12
Event Time : 7:00 - 8:30 pm
Registration Closing Date : 2019-06-05
CPD Hour(s) : 1.5
Venue : Macau Association of Building Contractors and Developers (MABCD) (Rua Do Campo No. 103 5Andar, Macau) 澳門建築置業商會 (澳門水坑尾街103號建築置業商會大廈五樓)
Division : HKIS
Organizer : HKIS、ICES & MABCD
Fee : HK$80 for members of HKIS, ICES & MABCD ; HK$150 for non-members (HK$30 walk-in surcharge on all prices listed)
Priority : Members of HKIS, ICES & MABCD; First-come-first-served
Language : Cantonese (supplemented with English)
Details :

The Speaker will discuss the following in his talk:

 

The talk will demonstrate and discuss the design principles and technical features for the construction of the HK-Zhuhai-Macao Bridge project. The talk will further divide into the following sub-categories for discussion:

 

  1. Construction of the Hong Kong Link Road along the South-Western coast of Lantau Island.
  2. Construction of the Hong Kong Link Road landed onto the South Perimeter Road of CLK
  3. Link Bridge getting into the tunnel at Scenic Hill
  4. Link road between the tunnel at Scenic Hill and the Man-made Island
  5. Forming of the Man-made Island
  6. Construction of the Boundary Crossing Facilities
  7. Construction of the Link Road (Tai Ho Junction)
  8. Construction of the Link Road (Junction at Man-made Island)
  9. Construction of the Tuen Mun-Chak Lap Kok Link Road (Junction at Tuen Mun)
  10. Brief illustration of the Zhuhai and Macao facilities
Remarks :

FULL (NO WALK IN AVAILABLE)

CPD in Macau

  1. This event is jointly organized by the HKIS, ICES and MABCD in Macau.
  2. CPD coupon is not accepted for this event.
Payment : HKD 80
Face-to-Face/Zoom : Please refer to the remarks