Code : 2021182
Event Name : Virtual Site Visits – Challenges faced by Project Manager and ways to meet time, cost and quality requirements
CPD Code : Formal Events
Speaker : Ir Mak Ping Chung, Assistant General Manager of Fung Cheung Kee Group
MSc (Hons), BSc.(Hons), RPE(STL), MHKIE, MIstructE, MHKICM, C.Eng., MCRC(RGBC), AS(RGBC), MTC(CoP Structural Use of Steel)

Ir Mak has 24 years job experience in local construction industry. He is a active player in construction industry and being the member of the government committees, Contractor Registration Committee and Technical Committee on the Code of Practice for the Structural Use of Steel.

His project teams also participated the HKICM Award 2018 & 2020 and more than 20 awards were gained in these two Awards. He has experience in several particular areas such as building construction, foundation, basement, pile cap, steel structure, precast elements, footbridge, excavation and lateral support, A&A work and minor works.
Event Date : 2021-12-07
Event Time : 7:00 pm - 8:30 pm
Registration Closing Date : 2021-12-05
CPD Hour(s) : 1.5
Divisional PQSL Hour(s) : 1.5
Venue : By online media – ZOOM
Division : QSD
Organizer : The Hong Kong Institute of Surveyors (Quantity Surveying Division) and Hong Kong Institute of Construction Managers
Fee : HK$150 for HKIS and HKICM members; HK$210 for non-members
Priority : HKIS and HKICM members; first-come-first-served
Language : Cantonese supplemented by English
Details :

The virtual site visits include two projects below:

 

Project (1) - Supply & Installation of Hoarding Works

The project (1) is a hoarding & demolition works contract at LOHAS Park, Tseung Kwan O, to be completed within 90 calender days. The challenge is a very tight schedule involving all the necessary submission & approval of BD hoarding amendments.

 

Project (2) - Main Contract for Proposed Residential Development

This project (2) is a residential development at Waterloo Road, Kowloon to be completed within 570 calender days. The challenge is about the drainage connection works involving permit applications, in the heavy traffic carriageway at Boundary Street.

The challenges faced by the Project Manager and the solutions to overcome the site construction problems include the use some new technologies, e.g. adopting the 3D Laser scanner to get 3D models and remote demolition robot to carry out demolition work to help deliver more reliably and efficiently service.

Remarks :

The event will be conducted online via ZOOM. Successful registrants will be notified separately via email with the web link in due course to the online event.

Please install the Zoom Application in advance at https://www.zoom.us/download.

  • For Mobile phones, iPads & Android, install the ZOOM Cloud Meetings app from App Store or Play Store.
  • For PC and Mac, download and install the Zoom Client for Meetings.
Payment : HKD 150
Face-to-Face/Zoom : Please refer to the remarks