Code : 2022033
Event Name : Practical Experience Sharing on Excavation and Lateral Support (ELS) and Piling Works
CPD Code : Formal Events
Speaker : Ir Wilson SF WONG
MHKIE

Ir WONG is the Senior Project Manager of Wing Shing Caisson & Foundation Ltd. During his more than 25 years experience in construction industry, he has extensively exposed to Excavation and Lateral Support (ELS) and Piling Works. As a main contractor/ sub-contractor, he has managed various projects with different scale from tendering stage to construction stage and upon completion subsequently settlement of final account. Especially, he has faced different kinds of construction challenges during the construction stage. As a qualified engineer working in a specialist foundation contractor, all these construction difficulties have been overcome and resolved tactfully.
Event Date : 2022-03-30
Event Time : 7:00 pm – 8:30 pm
Registration Closing Date : 2022-03-28
CPD Hour(s) : 1.5
Divisional PQSL Hour(s) : 1.5
Venue : By online media – ZOOM
Division : QSD
Organizer : The Hong Kong Institute of Surveyors (Quantity Surveying Division) and Hong Kong Institute of Construction Managers
Fee : HK$150 for HKIS and HKICM members; HK$210 for non-members
Priority : HKIS and HKICM members; first-come-first-served
Language : Cantonese supplemented by English
Details :

In the talk, the speaker will share his experience on ELS and Piling works including:-

  • Briefing on different types of ELS and piling commonly used in Hong Kong,
  • Introducing the structural elements of each types of ELS and piling,
  • Associated constructional plants and equipment to be deployed for each types of ELS and piling,
  • Challenges and safety measures to be encountered during construction, and
  • Case Study : A typical sample of completed project for Site Formation, Socketed H-Pile Foundation and ELS Works at location of Peak Road region, which comprised pipe piles with steel lagging and tie-back nails, grout curtain & pumping test, sheet piles, waling & struts for the ELS system (the excavation depth is about 11m) and socketed H-piles for the foundation, and also soldier piles for site formation of retaining wall. A common right of way (one-way width) being shared with adjacent lots of residence is the main construction access for in/out of the site from the Peak Road.
Remarks :

Reschedule from 16 March 2022

The event will be conducted online via ZOOM. Upon successful payment of the registration fee, the ZOOM link for joining the CPD event will be available in the CPD/PQSL profile under the "Member Area" of the HKIS website.

On-line registration is not applicable for non-HKIS members. To register, please complete the CPD registration form (https://www.hkis.org.hk/en/pdf/Standard_Reservation_Form2020.pdf) and return with payment to the HKIS Secretariat.

Please install the Zoom Application in advance at https://www.zoom.us/download.

  • For Mobile phones, iPads & Android, install the ZOOM Cloud Meetings app from App Store or Play Store.
  • For PC and Mac, download and install the Zoom Client for Meetings.
Payment : HKD 150
Face-to-Face/Zoom : By Zoom