Code : 2023095
Event Name : Site Visit to Central Kowloon Route
CPD Code : Formal Events
Event Date : 2023-06-03
Event Time : 9:15am-11:50am
Registration Closing Date : 2023-05-27
CPD Hour(s) : 2.5
Divisional PQSL Hour(s) : 2.5
Venue : 1. Community Liaison Centre (CLC) at Ma Tau Kok 2. Kai Tak West (KTW) Site (Kowloon City Ferry Pier) 3. Kai Tak East (KTE) Site (S4 bridge deck)
Division : QSD
Organizer : The Hong Kong Institute of Surveyors (Quantity Surveying Division) and Hong Kong Institute of Construction Managers
Fee : HK$200 for members; HK$220 for non-members
Priority : HKIS members; first-come-first-served
Language : Cantonese supplemented by English
Details :

Central Kowloon Route (“CKR”) is a dual three-lane carriageway with a total length of 4.7km, linking Yau Ma Tei Interchange of West Kowloon with Kai Tak Development Area and road network of Kowloon Bay, forming a trunk road across central Kowloon. Upon commissioning, the journey time between Yau Ma Tei and Kowloon Bay during peak hours is expected to be shortened from 30 minutes to about 5 minutes only.

CKR is divided into 8 works contracts. Other than the first four works contracts adopting conventional Government conditions of contract (GCC), the remaining four works contracts (Kai Tak East, Central Tunnel, Buildings, Electrical and Mechanical Works and Remaining Works contracts adopt NEC ECC Option C.

In addition, to echo “Construction 2.0”, CKR as one of the pioneers in innovative technologies within construction industry, introduce and implement various innovative management system and construction methods to uplift the efficiency and sustainability of the industry, increase productivity, enhancing supervision and quality assurance, improve site safety and reduce environmental impacts.

Tentative Rundown:

Duration

Details

Speaker

9:15 – 10:15 am

(1 hr)

Location 1 – CKR CLC

  1. Introduction of CKR project
  2. Application of CDE in CKR project
    • BIM for Construction Planning
    • Integrated Digital Works Supervision System (iDWSS) for performance management
    • Smart Site Management Hub (SSMH) for Safety and Progress monitoring
  3. Challenge and Future Development
  4. Demonstration of SSMH

 

Presenter:

 Ir Tsui Wai

 

Supported by

Innovation Team

 

 

 

 

10:15 – 10:25 am

(10 mins)

Q&A

-

10:25 – 10:35 am

(10 mins)

Guided Tour in CKR CLC

  • Hologram & CAVE

PR Team

10:35 – 10:40 am

(5 mins)

Safety Induction

GCL

10:40 – 10:45 am

(5 mins)

Present appreciation certificate

Group photos

PPE for site visit

PR Team

10:45 – 10:50 am

(5 mins)

Walking from CLC to Location 2 – KTW site

-

10:50 – 11:10 am

(20 mins)

Location 2 – KTW - Kowloon City Ferry Pier

Introduction of underwater tunnel construction

Group Photo

Anthony’s Team

11:10 – 11:25 am

(15 mins)

Travel from KTW site to Location 3 – KTE site

Shuttle bus

11:25 - 11:45 am

(20 mins)

Location 3 – KTE – S4 Bridge Deck

  Introduction of Kai Tak Connection Bridges

Group Photo

Daniel’s Team

11:45 – 11:50 am

(5 mins)

Travel from KTE site to CLC

Shuttle bus

11:50 am

 

Return of PPE

Dismiss

PR Team

 

Remarks :
  1. Online registration is not accepted for this CPD event. First-come-first-served with duly completed Standard Reservation Form and Declaration Form,  and payment.
  2. Gather and dismiss at CKR-CLC (address: 12, Long Yuet Street, To Kwa Wan. (Opposite to Wei Chien Court, Block H, Wyler Gardens).
  3. PPE (safety helmet & reflective vest) will be provided on site by RSS. Participants should prepare their own safety shoes.
  4. Transportation between visit points will be provided by CKR contract cars unless specified otherwise.
  5. Adverse weather arrangement:
    1. Shower – The visit will be still held and an umbrella will be provided for each guest during the visit. Umbrellas will be placed in CLC
  6. Dress code: comfortable for site visit.
Payment : HKD 200
Face-to-Face/Zoom : Face-to-Face